Quick
Search: 
 
advanced search
 GSW Home    GeoRef Home    My GSW Alerts    Contact GSW    About GSW    Journals List    Help 
Exploration and Mining Geology Don't get GSW? Talk to your librarian.
JOURNAL HOME HELP CONTACT PUBLISHER SUBSCRIBE ARCHIVE SEARCH TABLE OF CONTENTS

Exploration and Mining Geology; January 2004; v. 13; no. 1-4; p. 139-146; DOI: 10.2113/gsemg.13.1-4.139
© 2004 Canadian Institute of Mining, Metallurgy & Petroleum
This Article
Right arrow Figures Only
Right arrow Full Text
Right arrow Full Text (PDF)
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow reprints & permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by HASSANIPAK, A.A.
Right arrow Articles by SHARAFODIN, M.
Right arrow Search for Related Content
GeoRef
Right arrow GeoRef Citation

GET: A Function for Preferential Site Selection of Additional Borehole Drilling

A.A. HASSANIPAK

Department of Mining Engineering, University of Tehran Tehran, Iran

M. SHARAFODIN

Research Institute of Petroleum Industry of Iran Tehran, Iran

The essential aims of additional borehole drilling are to improve the reliability of grade and tonnage estimates in each reserve class and to increase ore tonnages. The "GET" function presented in this paper considers strategies for achieving both of these goals simultaneously, and therefore is advantageous for selecting sites for additional boreholes. The "GET" function is either a linear or a non-linear product of three variables G, E, and T: f(G,E,T,) = G{alpha}EßT{gamma} where the values of any or all of the exponents {alpha}, ß, and {gamma} may differ from unity at the discretion of the user. G and E are the average estimated block grade and the average estimation error for ore blocks in one vertical column, and T is the compounded ore thickness within the column. To illustrate its utility, the GET function has been used for determination of the most advantageous sites for additional drilling in the Shah-Kuh Pb-Zn deposit in west central Iran.







JOURNAL HOME HELP CONTACT PUBLISHER SUBSCRIBE ARCHIVE SEARCH TABLE OF CONTENTS
Copyright © 2009 by Canadian Institute of Mining, Metallurgy & Petroleum