|
|
|
|||||||||||||||||
| JOURNAL HOME | HELP | CONTACT PUBLISHER | SUBSCRIBE | ARCHIVE | SEARCH | TABLE OF CONTENTS |
Department of Mining Engineering, University of Tehran Tehran, Iran
Research Institute of Petroleum Industry of Iran Tehran, Iran
The essential aims of additional borehole drilling are to improve the reliability of grade and tonnage estimates in each reserve class and to increase ore tonnages. The "GET" function presented in this paper considers strategies for achieving both of these goals simultaneously, and therefore is advantageous for selecting sites for additional boreholes. The "GET" function is either a linear or a non-linear product of three variables G, E, and T: f(G,E,T,) = G
EßT
where the values of any or all of the exponents
, ß, and
may differ from unity at the discretion of the user. G and E are the average estimated block grade and the average estimation error for ore blocks in one vertical column, and T is the compounded ore thickness within the column. To illustrate its utility, the GET function has been used for determination of the most advantageous sites for additional drilling in the Shah-Kuh Pb-Zn deposit in west central Iran.
| JOURNAL HOME | HELP | CONTACT PUBLISHER | SUBSCRIBE | ARCHIVE | SEARCH | TABLE OF CONTENTS |